Building in Jamaica: a plain-language guide

Most building work in Jamaica touches two separate questions: is the use and form of the development acceptable, and is the construction itself acceptable.

Planning permission

Planning permission deals with whether the development is appropriate for the site — its use, scale, density, access and impact. Applications are generally made to the Municipal Corporation for the parish (or the KSAMC for Kingston and St Andrew), which may refer the application to national agencies for comment.

Building approval

Building approval deals with how the structure is built — the drawings, structural design, drainage, sanitation and compliance with the applicable building standards. Inspections may be required at stages during construction.

Agencies that may be involved

Depending on the site and the project, an application may be referred to bodies such as the National Environment and Planning Agency, the National Works Agency, the Water Resources Authority, the National Water Commission or the relevant health authority. Referral is decided by the authority handling your application — not by you, and not by Build In Jamaica.

The usual order of things

  1. Confirm your ownership evidence and the property boundaries.
  2. Engage the professionals your project needs.
  3. Prepare drawings and supporting documents.
  4. Submit to the responsible authority.
  5. Respond to completeness and technical review queries.
  6. Receive a decision, then any permits and inspection requirements.

This guide is general information. Requirements vary by parish, site and project. Always confirm with the responsible authority or a qualified professional.